April 2021 Campus Work Day Report

April 3, 2021 was a productive campus workday.  The team was: Chris Cassell, Dave Joki, Jaralyn Moran, Paul and John Kostka, and Robert and Nancy Neff

Highlights:

  • About half the parking lot was swept up, including large piles of pine needles along the exit drive.  Picked up under the redwoods out front.  Looks better!
  • Fencing was constructed along the exit drive.
  • The new mailbox was installed by the west Main Hall door.
  • A new sprayer was put on the hose in the Til Evans garden.  
  • We improved the East side door closing in the fireside room.  
  • Weeding out front, especially between the sidewalk and the street.
  • Tried a new, folding garden cart.  Worked well for toting things around.  It is stored in the tool closet right now.

Put May 1, 9-12 AM on your calendar!